Skip to main content

Running the Calculations

PRENGUIN checks each building element you’ve created to the required AS/NZS design standards, for the specific project.

By clicking “Run” Prenguin has calculated the various loads and forces on each building elements, and compared them to the specific capacities.

As PRENGUIN completes the calculations, the building elements are coloured green to indicate a pass, or red to indicate they do not.

When you’ve added and engineered all of the building elements, the next step is to request a design certificate.